149
Shround Conditon
Brake
 
Required
Yes
10-23-2009
Identified 3 of 5 bolts are missing on shroud.
1
142
Tie Off Rail
Nacelle
 
Required
Yes
10-26-2009
Tie-off rail is missing fastening (nuts/bolts) hardware on front section. Safety issue that should be immediately addressed.
1
150
Rotor Lock Condition
Brake
 
Required
N/A
10-26-2009
Identified difficulty in applying the rotor lock. Should be further investigated.
1
107
Ladder / Safety Equipment
Tower
 
Required
Yes
10-22-2009
Ladder has several bent rungs discovered during climb between lower and middle sections. Appears that something had 'dropped' onto them from above. The ladder safety system (LSS) cable rubs against the bottom and third doors. To correct this, the cable guides should be re-spaced to properly posistion the cable away from the doors.
1
183
Rotor Hub Cleanliness
Hub & Rotor
 
Required
N/A
10-26-2009
Unable to enter hub for inspection. Rotor lock mechanism has been dismantled for service.
1
184
Delat Connection
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
110
Tower Lighting / Wiring / Hardware
Tower
 
Required
Yes
10-22-2009
Identified three light fixtures with burned or malfunctioning bulbs during climb through middle and upper sections. These should be replaced and/or checked for operation.
1
185
Pitch Gear Wear
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
186
Pitch Bearings & Seals
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
187
Pitch Rams ( Condition, Leaks)
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
188
Proportional Valves ( condition, Leaks)
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
189
Pitch Auto Luber
Hub & Rotor
 
Required
N/A
10-26-2009
 
1
150
Rotor Lock Condition
Brake
 
Required
Yes
10-26-2009
Identified that the right side rotor lock is bent. Unable to install. Safety issue that should be immediately addressed.
1
89
Steps, Handrail, Door, Door Locks
Down Tower
 
Required
Yes
10-26-2009
Entrance stairs bottom step is loose. Safety issue that should be immediately addressed.
1
108
Tower (cracks, corrosion, bolts)
Tower
 
Required
Yes
10-26-2009
Identified excessive corrosion on base to mid flange bolts. See photos included in this report.
1
107
Ladder / Safety Equipment
Tower
 
Required
Yes
10-26-2009
LSS safety cable lower turnbuckle is damaged and should be replaced. See photo in report.
1
89
Steps, Handrail, Door, Door Locks
Down Tower
 
Required
Yes
10-26-2009
Handrail is missing on right side of stairs. Safety issue that should be immediately addressed.
1
111
Platform Doors
Tower
 
Required
Yes
10-26-2009
LSS cable rub identified at upper platform door. Cable guide can be adjusted to eliminate this issue.
1
111
Platform Doors
Tower
 
Required
Yes
10-26-2009
Platform door from middle to upper section has been removed and is missing. Safety issue that should be addressed immediately.
1
134
Safety Shields/Covers/Placards
Nacelle
 
Required
Yes
10-26-2009
Identified the emergency stop button on the main shaft is broken and inoperable. Safety issue-replace immediately.
1
107
Ladder / Safety Equipment
Tower
 
Required
Yes
10-23-2009
Ladder Safety System (LSS) cable is loose at the base connection. Should be tightened to manufacturer specifications
1
107
Ladder / Safety Equipment
Tower
 
Required
Yes
10-26-2009
The ladder safety system (LSS) cable rubs against the bottom and third doors. To correct this, the cable guides should be re-spaced to properly posistion the cable away from the doors.
1
88
Foundation & Base of Tower
Down Tower
 
Required
Yes
10-23-2009
Identified three locations of cracking in foundation. Appear to be approx 6-10 inches long, in intervals of 2-3 feet apart. Photos included in report.
2
88
Foundation & Base of Tower
Down Tower
 
Required
Yes
10-26-2009
Identified 4 base bolts near doorway that are missing torque check marks.
2
137
Hydraulic Station Oil Level
Nacelle
 
Required
Yes
10-23-2009
Identified Hydro level low when in standby condition. Requires attention by site personnel.
2
155
Stator Cable Terminations
Generator
 
Required
Yes
10-26-2009
Termination cables are not marked from torque checks.
2
156
Rotor Cable Terminations
Generator
 
Required
Yes
10-26-2009
Termination cables are not marked from torque checks.
2
178
Low Speed Shaft Coupling
Gearbox
 
Required
Yes
10-23-2009
Identified single loose bolt on shrink disc. See marking left on bolt head. Torque spec unknown.
2
179
High Speed Coupling
Gearbox
 
Required
Yes
10-23-2009
Dog bone bushing showing wear and cracking. Should be replaced at next service interval.
2
113
Wire Harness Clamps/Zip ties
Tower
 
Required
Yes
10-26-2009
Cable is not properly fastened between base and middle section. Identified 5 missing cable holders in this section.
2
158
Generator Slip Rings & Brushes
Generator
 
Required
Yes
10-26-2009
Identified an excessive amount of (brush) material dusting on brush holders. Brush material is within specifications.
2
121
Overall Condition
Yaw System
 
Required
Yes
10-26-2009
Excessive grease/dirt on exterior of yaw drives and motors.
2
112
Bolt Torque Check (torque stripe)
Tower
 
Required
No
10-22-2009
Did not conduct torque checks for this inspection however, was unable to find torque marks (identifiers for previous 10% torque check) on any inside tower structure bolts (lower, middle, upper, yaw deck). A full re-torque of the tower should be completed and proper identifying marks applied.
2
112
Bolt Torque Check (torque stripe)
Tower
 
Required
Yes
10-23-2009
Did not conduct torque checks for this inspection however, was unable to find torque marks (identifiers for previous 10% torque check) on any inside tower structure bolts (lower, middle, upper, yaw deck). A full re-torque of the tower should be completed and proper identifying marks applied.
2
122
Yaw Bearing
Yaw System
 
Required
Yes
10-23-2009
Identified excessive grease on yaw bearing face plate.
2
135
Oil Leaks
Nacelle
 
Required
 
10-22-2009
Identified a leak at K1 pipe connection to cooler, possible o-ring failure or loose connection.
2
137
Hydraulic Station Oil Level
Nacelle
 
Required
Yes
10-22-2009
Identified Hydro level low when in standby condition. Requires attention by site personnel.
2
119
Counterweight
Cable Twist/Stop System
 
Required
Yes
10-26-2009
Counterweight is missing. CTS is inoperable at this inspection.
2
186
Pitch Bearings & Seals
Hub & Rotor
 
Required
Yes
10-26-2009
Both blade 2 and 3 have leaking bearing seals. Excessive grease identified on inside and outside of blades.
2
88
Foundation & Base of Tower
Down Tower
 
Required
Yes
10-26-2009
Identified three loose base bolts,located below filter housing (1) and entrance steps (2).
2
92
Shutdown turbine (noises, etc.)
Down Tower
 
Required
Yes
10-26-2009
During turbine shutdown, blades moved in fast pitch motion. Possible indication of proportional valve feedback error or malfunction.
2
200
Note 1
Additional Comments
 
Required
Yes
10-26-2009
None of the generator feet bolts have torque check marks. Re-torque should be performed according to manufacturer specifications.
2
88
Foundation & Base of Tower
Down Tower
 
Required
Yes
10-26-2009
Foundation crack of approximately 24 inches in length identified inside of the tower. See photos attached to report.
2
97
Inside Controller Wiring & Cables
Controller
 
Required
Yes
10-26-2009
Identified two cables that have been routed directly over the cabinet heater. See photos attached to report. These cables should be re-routed properly through the appropriate cable raceways.
2
112
Bolt Torque Check (torque stripe)
Tower
 
Required
Yes
10-23-2009
Did not conduct torque checks for this inspection however, was unable to find torque marks (identifiers for previous 10% torque check) on any inside tower structure bolts (lower, middle, upper, yaw deck). A full re-torque of the tower should be completed and proper identifying marks applied.
2
148
Brakes (general condition, pads)
Brake
 
Required
Yes
10-26-2009
Identified excessive brake dust coating the calipers. Brake pad material is within specifications.
2
112
Bolt Torque Check (torque stripe)
Tower
 
Required
Yes
10-26-2009
Did not conduct torque checks for this inspection however, was unable to find torque marks (identifiers for previous 10% torque check) on any inside tower structure bolts (lower, middle, upper, yaw deck). A full re-torque of the tower should be completed and proper identifying marks applied.
2
113
Wire Harness Clamps/Zip ties
Tower
 
Required
Yes
10-26-2009
All cables in base section have been installed incorrectly and are not routed within raceways located behind the control panel cabinet.
2
155
Stator Cable Terminations
Generator
 
Required
Yes
10-26-2009
Termination cables are not marked from torque checks.
2
156
Rotor Cable Terminations
Generator
 
Required
Yes
10-26-2009
Termination cables are not marked from torque checks.
2
1  2  3  Next  Last       Records 1 to 50 of 116     
Page Size 

 

 www.rev1wind.com